RM22's Power unit in the sun for the first time in 5 months 800x600 2007_08190030.JPG |
Extensive Crack testing and repair, Compressor overhaul and Almost complete re-wiring has taken longer than expected 800x600 2007_08190031.JPG |
Entering 4 road to be reunited with its other half 800x600 2007_08190032.JPG |
Track gang working on Healesville Yard 800x600 2007_08190033.JPG |
Receiving black paint to the frame and wheels 800x600 2007_08190034.JPG |
Good old Civil Branch 800x600 2007_08190035.JPG |
The pigstye that held the trailer alloft. Note the recently repaired control cabling. 800x600 2007_08190036.JPG |
Paul surveys the black paint on the power unit 800x600 2007_08190037.JPG |
ready to re join 800x600 2007_08190038.JPG |
Back together at last, Saturday 19th August 2007 800x600 2007_08190039.JPG |
Ready to pull apart again. RM22 complete for almost a day 800x600 2007_08190040.JPG |
Ready to lift the trailing bogie 450x600 2007_08190041.JPG |
Rear Bogie ready for crack detection 800x600 2007_08190042.JPG |
the removal of brake dust begins. After removal, the underframe is indeed still painted black. 800x600 2007_08190043.JPG |
New black on the old 800x600 2007_08190044.JPG |
The Brake cylinder already checked, crack detection in the next week will see the bogie returned to the body in a weeks time. 800x600 2007_08190045.JPG |
800x600 DSCF0365.JPG |
800x600 DSCF0716.JPG |
800x600 DSCF0955.JPG |
800x600 DSCF1920.JPG |
800x600 DSCF2173.JPG |
800x600 DSCF2244.JPG |
800x600 DSCF2259.JPG |
800x600 DSCF2260.JPG |
| | | |